Where is the loader in Laizhou

  • Keeping things moving quickly - Railway Track and Structures

    Apr 11, 2012 · "With a travel speed of 60 mph and a regulating speed of up to 10 mph, this 60-foot long giant can make short work of any project," he said. The braking system provides air for cars being towed, as well for the basic unit. A 500-gallon water tank is available so the ballast can be sprayed to reduce dust when required.

    Learn More
  • 446D Backhoe Loader, AEHQ5579 - Kelly Tractor

    Power Train Cat 3114 DIT engine is designed to meet demanding 446D requirements. pg. 8 yourself, hit the job with more power, superior breakout forces and smooth Superior bucket rotation and forces, an excavator-style backhoe boom and an optional

    Learn More
  • A guy gets hit with a excavator bucket - YouTube

    Jun 11, 2015 · In this case, the worker on the bucket would shout out to his co-worker in the excavator cab to lift him "up higher." The worker with the saw would then brace himself against the excavator's arm and/or the remains of the eves to keep from falling while the bucket was raised or, when demanded, lowered. At least they had open lines of communication.

    Learn More
  • Firm fined after train hit digger bucket left on line

    Mar 02, 2018 · The six-carriage train struck an excavator bucket which had been left on the track near Lisburn, County Antrim, in February 2016. There were eight passengers and three crew on …

    Learn More
  • GRADALL XL 5100 IV WHEELED EXCAVATOR - World …

    Gradall XL 5100 IV has a six-speed AutoDrive Allison transmission and transfer-case system that allows travel at up to 60 mph highway. Models are available with either a 6 x 4 or 6 x 6 drive train. Maximum reach is 33 feet, 9 inches. The boom has full-tilting power, and maximum dig depth is 24 feet, 5 inches. Loading height maximum is 18 feet.

    Learn More
  • Success Stories | Work Accident Injury Clients | Bolt

    Accident caused by a detached excavator bucket. Our client suffered severe orthopaedic, neurological and psychiatric injuries when struck on the head and left (dominant) arm by a 1-tonne bucket that became detached from an excavator and fell on him. He was rendered unconscious immediately.

    Learn More
  • WATCH: Skeleton Slider Hits Broom @ 60MPH

    Station. The train hit the bucket at a speed of 57 mph (92 km/h) and then travelled 330 metres in an upright position before stopping. There were no significant injuries to the people on the train, but the leading vehicle was badly damaged and the track required repair. The bucket had been detached from an excavator machine undertaking track

    Learn More
  • Why was digger bucket left on busy rail line, and why did

    Feb 05, 2016 · A Portadown to Lisburn train hit the bucket from an excavator on the line at around 6.45am. The object smashed the two front windows of the train, but no …

    Learn More
  • 60mph train hits bucket - Scottish Plant

    Feb 15, 2016 · The Rail Accident Investigation Branch has revealed that the Belfast to Portadown train was travelling at about 60 mph when it struck an excavator bucket that had been left on the track by

    Learn More
  • Preventing Injuries When Working with Hydraulic Excavators

    The operator had positioned the excavator bucket near a manhole section while the victim attached a three-legged bridle to the manhole section for lifting. The bucket disconnected from the excavator stick (Figure 1) and struck the victim. He was pronounced dead at the scene [NIOSH 2001].

    Learn More
  • M317F Wheeled Excavator | Cat | Caterpillar

    Range values are calculated with GD bucket 1100 mm (3'7"), 0.80 m3 (1.05 yd3) with tips K080 and quick coupler with a tip radius of 1574 mm (5'2"). VA Boom - 2600 mm (8'6") Stick Length: Digging Height

    Learn More
  • Rail Accident Report - GOV.UK

    EXCAVATOR BUCKET SIZING DETERMINING MAXIMUM EXCAVATOR BUCKET SIZE 1. Find Maximum Lift and OEM Bucket Weight. Refer to OEM specification sheet to obtain maximum lift capacity at full reach over the side for your machine and the weight of the bucket used. Use a …

    Learn More
  • RAIB Bulletin 03/2015 - GOV.UK

    The train, reporting number1 5J61, was the 04:20 hrs empty coaching stock service from Norwich Crown Point depot to Lowestoft, comprising two class 170, three-car diesel multiple units. At the time the driver did not know what his train had struck and in response …

    Learn More
  • 43 Heg Low | Tractor | Loader (Equipment)

    The bucket has removable plates on the sides of the bucket for access to the bucket pins when maintenance is needed. Caterpillar Inc. Enter 9682 on Reader Reply Card High reach processors LXP 200 and LXP 400 Logix Pro- cessors are spe- cically designed for hi gh-reach applications, and to bring third- member versatil- ity to excavators in the

    Learn More
  • Train hit excavator bucket at 60mph - The Construction Index

    Jul 02, 2021 · Train hydraulic excavator operators in the proper procedures for engaging excavation attachments and incorporate these procedures into the company's safety and health program. A heavy equipment operator dies when he was struck by an excavator bucket that detached from a quick coupler – California pdf icon [PDF 343 KB] Page last reviewed

    Learn More
  • Citation(s) as Originally Issued Citation 1 Item 1

    6 Crushed between bucket & rear of dozer – Inspection #1133990 A 45 year old male employee was fatally injured when he was crushed between the bucket of an excavator and the rear of a dozer. On the day of the accident the victim, a mechanic, and a second mechanic were trouble shooting a …

    Learn More
  • Investigation report - Report into a fatality at Goonyella

    August 2017 while he was performing maintenance on the outside of an excavator bucket at the Goonyella Riverside Mine. The work involved removing an external wear plate of the bucket by cutting it into smaller pieces. While performing a cut, part of the plate unexpectedly sprung up and struck Mr Springer in the head.

    Learn More
  • Keeping things moving quickly - Railway Track and Structures

    Apr 11, 2012 · "With a travel speed of 60 mph and a regulating speed of up to 10 mph, this 60-foot long giant can make short work of any project," he said. The braking system provides air for cars being towed, as well for the basic unit. A 500-gallon water tank is available so the ballast can be sprayed to reduce dust when required.

    Learn More
  • Tåsen accident - Wikipedia

    The excavator's tilting bucket smashed into the front window of the first wagon and destroyed the whole front part of the train. A 26-year-old woman sat with her 6-year-old daughter in the front of the train when the bucket hit the train's left part. She died after a few seconds, while her child was seriously wounded, and sent to Ullevål

    Learn More
  • Skydiver in Berlin miraculously survives 12,000ft-high

    Nov 09, 2015 · Skydiver suffers broken back and collapsed lung but miraculously survives 12,000ft-high jump near Berlin after she hit the ground at 60mph when both her parachutes became tangled

    Learn More