MTTC 120-9S WHEEL TYPE BACKHOE 0 35m³ Cavite - Philippines

  • Earth moving Equipment function and standard Productivity

    Feb 16, 2013 · Typically trucks are sized by trailer volume. Obviously, the larger and heavier the load, the larger a tractor you need to pull the trailer. •Trucks are typically used with excavators and loaders for excavation and soil haul off or delivery. Compared to other …

    Learn More
  • Excavation in Construction from Construction Knowledge.net

    Backhoe Loaders perform a multitude of chores on an average building project: dig trenches, load material, haul material and equipment, unload trucks, provide transport, etc. Backhoe loaders are self-propelled and rubber-tire machines. These web links show equipment specifications for several common backhoe loaders.

    Learn More
  • Work Procedure of Excavation at Construction Site - The

    Work procedure for excavation at construction site involves understanding of centre line and excavation drawings, setting out of plan on ground, excavation of soil and removal of excess soil. Quality checks such as recording ground level and marking of reference points should be done. Excavation is the process of moving earth, rock or other

    Learn More
  • Excavator and Excavating Machinery

    Excavator is called 'Pelle' in French, 'Bagger' in Germany, '' in Chinese and 'Graafmachine' in Netherlands. It is often used for digging of soils and for loading dump trucks in construction project, utility work and or paving, where large amount of earth materials need to be dug and moved.

    Learn More
  • Guide to the Different Types and Sizes of Excavators

    Apr 08, 2019 · Backhoe excavators are another nearly ubiquitous piece of equipment in construction, landscaping and mining. Often confused with standard excavators, backhoe excavators are backhoe loaders with an excavator boom attachment on the back of the machine. On the front of the backhoe is a large bucket or blade used to push, level and move soil and other materials.

    Learn More
  • Number of Truckloads to Remove Excavated Material in

    Estimate the number of truck loads it takes to remove excavated material off site. This calculator will calculate the volume of excavated material using length and width of the excavation in metres and the excavation depth from an average of four points. It will calculate the volume increase of the material using the swell/bulking percentage

    Learn More
  • A Data-Driv en Approach to Prediction and Optimal Bucket

    Fig. 1. Typical hydraulic excavator (backhoe) used in construction and mining industries. In many excavation tasks, the soil medium is fine and homogeneous. only fill the bucket to 80% of capacity [1]. Scooping a desired amount of soil is thus a critical requirement for autonomous excavators. Early work by Bernold [3] proposed force feedback and

    Learn More
  • 1. Earthmoving Materials and Operations

    Production of Earthmoving Equipment V 1 - ٩ • Soil and rock are the materials that make up the crust of the earth • General Soil Characteristics –Trafficability: is the ability of a soil to support the weight of vehicles under repeated traffic –Loadability: is a measure of the difficulty in excavating and loading a soil

    Learn More
  • need quick estimating advice. 6500 cubic yards with 320c

    Apr 28, 2010 · If its in the budget i would get some more trucks. I've moved over 110 loads a day with a 160, digging hard clay as i was going, with 3-4 trucks and a 10-15 minute haul. point being the machine won't be a limiting factor, it should take no more than 2 minutes to load the truck even digging hard clay.

    Learn More
  • Dig Into Excavator Productivity | For Construction Pros

    Jan 05, 2011 · Many excavators feature work modes. Say you pull the data after a guy has been on a big excavation job. He is loading trucks. After that job, there are over 250 hours of …

    Learn More
  • Excavators - an overview | ScienceDirect Topics

    Computation of excavator production: Excavator production is given by the following equation. q = 3600 B × E × P C. q = volume of soil excavated and dumped in a truck by the excavator (CY/h) B = bucket struck capacity (CY) E = bucket efficiency factor from table A. P = productivity factor from table B.

    Learn More
  • EXCAVATION MAN HOUR - TheProjectEstimate.com

    Then its capacity considered is ( (1x10)/0.04125) = 242.4242 m 3 / day. That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as: No. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days.

    Learn More
  • Construction Planning, Equipment, CHAPTER TRUCKS AND

    lost by the trucks or the excavator. CHAPTER 10. TRUCKS AND HAULING EQUIPMENT ENCE 420 ©Assakkaf Slide No. 39 USING SMALL TRUCKS COMPARED WITH LARGE TRUCKS Disadvantages: 1) A small truck is more difficult for the excavator to load owing to the small target for depositing the bucket load. 2) More total spotting time is lost in positioning the

    Learn More
  • Work Procedure of Excavation at Construction Site - The

    Work procedure for excavation at construction site involves understanding of centre line and excavation drawings, setting out of plan on ground, excavation of soil and removal of excess soil. Quality checks such as recording ground level and marking of reference points should be done. Excavation is the process of moving earth, rock or other

    Learn More
  • Rate Analysis of Excavation in Earthwork -Calculate

    Rate Analysis of Excavation in Earthwork -Calculate Cost

    Learn More
  • A Robotic Excavator for Autonomous Truck Loading

    sequence of dump points for loading soil into the truck bed. The digging motion planner controls the excavator during digging at the specified location. The dumping motion plan-ner dumps the bucket of soil into the truck and returns to the dig face. The sensor motion planner controls the panning for both scanners to coordinate scanner and excavator

    Learn More
  • Trenching and Excavation Safety

    Trenching and excavation work presents serious hazards to all workers involved. Cave-ins pose the greatest risk and are more Note: Unconfined compressive strength means the load per unit area at which a soil will fail in compression. It can be cost of safety equipment they …

    Learn More
  • Pricing Sitework & Excavation

    Common Types of Excavation 1. Cut and Fill operations: A. Large projects: dozers, scrapers, rollers, and water trucks, and graders. B. Small projects: grader or bobcat 2. Basement-type Excavation: track backhoe or track loader, and dump trucks

    Learn More
  • Extended Earthmoving with an Autonomous Excavator

    tor in a mass excavation scenario. As shown in Figure 1, the excavator sits on top of an elevated bench, removes material from the bench, and deposits it into an awaiting truck. There are several reasons for investigating the automation of truck loading with an excavator. First, it …

    Learn More
  • A Guide to OSHA Excavations Standard

    excavation is deep; however, when front end loaders are used to dig the excavations, the soil surcharge load must be placed as far back from the edge of the excavation as possible, but never closer than 2 feet (0.61 meters). Work crews in the excavation are the minimum number needed to perform the work.

    Learn More